2018
MHE-Demag launched and installed the first Demag V-type crane in the region. The new Demag V-type crane revolutionises load handling. Its innovative design featuring tapered diaphragm joints improves oscillation characteristics by 30%, cuts its weight by an average of 17% and doubles its service life to as many as 500,000 changes of load. The launch …
MHE-Demag launched and installed the first Demag V-type crane in the region. The new Demag V-type crane revolutionises load handling. Its innovative design featuring tapered diaphragm joints improves oscillation characteristics by 30%, cuts its weight by an average of 17% and doubles its service life to as many as 500,000 changes of load.
The launch of Demag V-type crane at MHE-Demag Thailand.
MHE-Demag installs Southeast Asia’s first full climbing building maintenance system in Jakarta’s third tallest building – Menara Astra, which consists of a 51-storey office tower and three prestigious apartments. The unique roof of Menara Astra requires a very special track to be customised and installed, and a special stunting card system that is seamlessly integrated into a 3D rail layout. To meet the challenge, MHE-Demag designed and installed 550 meters of round track around a complex 3D beam layout covering a floor space of 38 by 56 square meters underneath a helipad. The track network stretches 32 meter vertically from the 46th floor at 228-meter height and ends at the tip of the roof facade at 260-meter. It is a piece of engineering marvel where 90% of sections are unique and each requires to be customised and skillfully fitted on site, 260 meters up in the sky.
The first full climbing building maintenance system in South East Asia.